Great room at the drywall stage with arched openings and a coffered ceiling

Whole-Home Remodels

Layout changes, kitchens, baths, wiring, plumbing, and finishes, planned as one project on one schedule and managed start to finish by a licensed general contractor.

Get a Free Estimate

Services

What We Remodel

  • Full interior remodels and layout changes
  • Kitchens and bathrooms
  • Electrical, plumbing, and heating and cooling upgrades
  • Windows, doors, and exterior updates
  • Flooring, drywall, paint, and finish carpentry
  • Wall removal and structural changes

The Work

One Plan, One Schedule, One Point of Contact

A whole-home remodel is a dozen trades working in a set order: demolition, framing, plumbing, electrical, heating and cooling, insulation, drywall, cabinets, tile, floors, and paint. When the order slips, costs climb. We set the full scope and the selections before demolition starts, schedule every trade in sequence, and keep one person accountable for all of it.

Photos

Arched openings and a coffered ceiling in drywall, before paint
Drywall stage: arches and a coffered ceiling taking shape
Plank flooring being installed in a living room with a stone fireplace
New flooring going in around a stone fireplace
Finished living room with a fireplace and wood-look floors
Finished living room with a tiled fireplace
Vaulted great room with wood beams open to a white kitchen
Finished great room open to the kitchen

Good to Know

Remodeling in Del Mar: What to Know First

What Needs City Review

Interior remodeling is generally exempt from Del Mar's coastal permit, and work that leaves the outside of the house alone usually stays out of design review. Structural, electrical, plumbing, and mechanical work still needs building permits. Once a remodel changes windows, doors, the roofline, or the footprint, design review comes into play.

Older Homes Hide Things

Behind the walls of an older coastal home you can find outdated wiring, corroded pipes, and past water damage. Homes built before 1978 can also have lead paint, which federal rules require to be handled with lead-safe practices. We open up key areas early, so surprises come before the price is set and not after.

California Contract Rules Protect You

State law caps the down payment on a home improvement contract at $1,000 or 10 percent of the price, whichever is less. The contract has to be in writing, changes are written up as change orders, and you have three days to cancel after signing. We follow these rules on every job.

The City makes the final call on every project. Outside Del Mar the rules differ by city, and we check yours before we price the job.

How It Works

From Walkthrough to Move-In

Every project is managed start to finish by a licensed general contractor, with a trusted team of licensed trade partners and one point of contact.

Walkthrough and Wish List

We walk the house with you, look at the structure and systems, and sort the list into must-haves and nice-to-haves.

Scope, Selections, and Price

We coordinate design and engineering, help you make selections early, and give you a written scope, schedule, and price before demolition.

Build in Sequence

Each trade is scheduled in order, inspections are passed along the way, and you get regular updates through the final walkthrough.

FAQ

Whole-Home Remodel Questions, Answered

Should I remodel all at once or in phases?
All at once is usually faster and costs less overall, because each trade comes in once and the house is opened up one time. Phasing spreads out the cost and can let you stay in the home, but some work gets redone where the phases meet. We can price both so you can compare.
Can we live in the house during a whole-home remodel?
For a true whole-home remodel, most families move out. With no working kitchen or bath and dust in every room, staying is hard, and an empty house lets the work move faster. If you need to stay, we can phase the job around a livable part of the house.
How long does a whole-home remodel take?
It depends on the size of the house and how much of the structure and layout change. Planning, selections, and permits often take as long as construction. In a 2026 Houzz study of more than 20,000 homeowners, people spent more months planning kitchen and bath remodels than building them. After the first visit we give you a realistic schedule for your project.
What permits does a whole-home remodel need in Del Mar?
Building permits for structural, electrical, plumbing, and mechanical work. Interior remodeling is generally exempt from a coastal permit. Changes to the outside of the house, such as new or larger windows and doors, a new roofline, or added floor area, bring in the City's design review. We map this out before the design is final.
How do payments work?
California law limits the down payment on a home improvement contract to $1,000 or 10 percent of the contract price, whichever is less. After that, payments follow a schedule written into the contract and tied to completed work. Any change in scope or price is put in writing as a change order before that work is done.

Planning a Whole-Home Remodel?

We work in Del Mar, Solana Beach and Carmel Valley. Get in touch for a free estimate. We'll walk the house, talk through priorities and budget, and give you a straight answer on scope and cost.